- Phone: +98 31-35720330 +98 31-35721330
Posted(21 August 2021)
In order to increase production capacity and in accordance with pre-determined development plans in the first 5 months of this year, the following projects have been successfully implemented and exploited:
1- Installation of 25 and 8 ton Dual Truck( 8 MW) melting furnaces.
2- Installation of new precision high temperature heat treatment furnace with a capacity of 240 tons.
3- Installation of new low temperature heat treatment furnace with a capacity of 120 tons .